The redevelopment of Birmingham New Street Station significantly increased power consumption. A revolutionary approach to power and sustainability was required.
Combined Heat and Power is a long-term sustainable approach to power consumption. Qsustain with its partners took on the challenge to meet the demands of the new central transport hub.
The expansion of the station concourse and additional lifts and escalators will mean that we will need nearly double the amount of power. So, in 2009, Q Sustain working for Network Rail commissioned the lead design and engineering consultant, Atkins to carry out a Low and Zero Carbon (LZC) study for the project.
Exploration of various renewable and low carbon technologies ranging from Ground Source Heat Pumps (GSHP), Biomass boilers, and Photovoltaic (PV) to cover 2,000m2 around the South of the station façade. Using an existing city centre location meant many constraints excluded the use of many technologies such as Biomass and wind.
When PV’s were discounted due to the John Lewis development on the South Side removing the proposed PV area, Q Sustain working for Network Rail actively pursued the option of a Combined Heat & Power (CHP) scheme to provide the station with electric from gas and also look at options of connecting into the local district heating network to the North of the station. This would reduce carbon emissions from site micro generation, as opposed to traditional power station generated grid electric, reduce transmission losses and use the waste by-product of heat that is normally lost in the cooling towers of old power stations. The preferred bidder, Cofely were also very keen to use the subterranean network beneath the station to supply the south of the city and avoid disruption around the city centre.
The dilemma for Network Rail for using a CHP system was that the station demand profile was more electric intensive than heat. A heat partner was required to utilise surplus heat generated from the CHP plant and John Lewis was an ideal candidate being attached to the south of the station with its biggest store outside London.
With the inclusion of John Lewis agreeing to sign up to a heat agreement with Cofely, a carefully co-ordinated agreement was created that acquired simultaneous signing of Energy Supply Contracts.
1060 Tonnes of CO2 saved.
250k Saved by off-site manufacture.
75% Reduction in on-site workers.
98% Materials recycled.
We help our clients achieve greater engineering efficiencies with better economic and social outcomes.